AKU AKU

Listing ID:

200

Yacht Builder:

Queenship

Year Built:

1993

Yacht Type:

Power / Motor Yacht

Length:

98' 0"

Beam:

23' 0"

Draft:

5' 5"

Hull Material:

Fiberglass

Top:

Enclosed Flybridge

Flag / Nationality:

USA

Engines:

2xCaterpillar, 3406B

Horsepower:

540

Fuel Type:

Diesel

Engine Hours (Approximate):

5,200

Cruise Speed:

10.00 kts

Max Speed:

13.00 kts

Fuel Capacity:

3,200 Gallons

Water Capacity:

700 Gallons

Current Location

United States SE

Asking Price

2,895,000 (USD)

Features

New Glass Bridge including:
•4 each 19” Stealth Monitors
•Navnet System including 120 mile radar, AIS system, and Depth Sounder
•Reworked PTZ cameras to work with Navnet system-E/R and Aft Deck
•Installed FLIR System in Pilothouse
•Installed Navnet GPS on Arch and Furuno Depth sensor in hull
•2 Computers-one for navigation and one for 64 point Vessel Information Sys
•1 Each Uninterruptible Power Supply
•1 Each 21” monitor for internet service. Wireless Internet system on vessel
•Reworked and re-varnished elm burl on pilot house console

Roscioli Shipyard Work:
•New Bottom Job – primed against old tin based bottom paint
•Installed 4 green underwater lights
•Polished stainless anchor protectors
•Install SS protection on stem of vessel
•Removed old depth senders, patched with fiberglass and installed new depth
sender

Other Work:
•New Jade Mist awlcraft on hull (2010)
•New paint on sun exposed surfaces on superstructure (2010 and later)
•Removed old teak on bow seat, made fair and installed new cushions (2011)
•4 New Aere fenders and covers
•Installed new teak on decks (Finished in 2012)
•Painted all bilge areas in engine room (2010)
•Reworked floor in utility room and hallway (2010)
•Installed new player piano in library (2010)
•New carpet in guest staterooms and pilot house (2010)
•New vinyl wall coverings in guest area (2010)
•New tweed wall covering in port stateroom (2010)
•2 new Cruisair chillers for AC and several new air handlers (2010)
•New AC circulating pump and seawater pump (2010)
•New copper tubing piping on fuel system (2010)
•Recent 4000 hour top end work on both main engines (2010)
•New wiper pantograph arms and wiper blades (2010)
•New ladder to top of pilothouse (2010)
•New headliner in Master Stateroom & VIP Stateroom (2013)

Photo Gallery / Additional Images

Inquire About This Boat

Refresh Type the characters you see in this picture.
Type the characters you see in the picture; if you can't read them, submit the form and a new image will be generated. Not case sensitive.  Switch to audio verification.